Violation Detail
Standard Cited: 19100022 A02 General requirements.
Inspection Nr: 1409603.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $319.00
Current Penalty: $0.00
Issuance Date: 10/16/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 11/04/2019
Gravity:
Report ID: 0112300
Contest Date: 01/14/2020
Final Order: 06/25/2020
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/25/2020 | $0.00 | 11/04/2019 | Other | |
Penalty | C: Contested | 01/14/2020 | $319.00 | 11/04/2019 | Other | |
Penalty | Z: Issued | 10/16/2019 | $319.00 | 11/04/2019 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.22(a)(2): The employer did not ensure the floor of each workroom is maintained in a clean and, to the extent feasible, in a dry condition. When wet processes are used, drainage was not maintained and, to the extent feasible, dry standing places, such as false floors, platforms, and mats were not provided: (a) Stone fabrication shop: On or about 6-18-19 the employer did not ensure the floor of each workroom is maintained in a clean and, to the extent feasible, dry condition.