Violation Detail
Standard Cited: 19260451 F01 General requirements.
Inspection Nr: 1389995.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/17/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 06/06/2019
Gravity:
Report ID: 0316700
Contest Date:
Final Order: 06/10/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/10/2019 | $0.00 | 06/06/2019 | Other | |
| Penalty | Z: Issued | 05/17/2019 | $0.00 | 06/06/2019 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.451(f)(1): Scaffold and/or scaffold components were loaded in excess of their maximum intended loads or rated capacities, whichever was less: a) Scissor Lift Extension - An employee working on the scissor lift extension was exposed to a tipping hazard from not using the lift within its rated capacities or intended loads, on or about April 2, 2019. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Translate