Violation Detail
Standard Cited: 19100184 E03 I Slings.
Inspection Nr: 1379689.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/28/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 06/03/2019
Gravity:
Report ID: 0626700
Contest Date:
Final Order: 06/25/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/25/2019 | $0.00 | 06/03/2019 | Other | |
Penalty | Z: Issued | 05/28/2019 | $0.00 | 06/03/2019 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.184(e)(3)(i): A thorough periodic inspection of alloy steel chain slings was not made on a regular basis and/or were done at intervals greater than once every 12 months: a) At the light fab department, employees operated a 15-ton overhead crane and a periodic inspection of the steel chain slings was not conducted, exposing employees to struck by hazards.