Violation Detail
Standard Cited: 19100029 F04 Fall protection systems and falling object protection-criteria and practices.
Inspection Nr: 1374754.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/20/2019
Nr Instances: 1
Nr Exposed: 53
Abatement Date: 06/14/2019
Gravity:
Report ID: 0830100
Contest Date:
Final Order: 06/10/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/10/2019 | $0.00 | 06/14/2019 | Other | |
Penalty | Z: Issued | 05/20/2019 | $0.00 | 06/14/2019 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.29(f)(4): Openings in a stair rail system exceeded 19 inches at its least dimension: a) Coca Cola Bottling Company High Country, Stairway to Mezzanine: On January 30, 2019 and at times prior the employer failed to install an intermediate rail to the stairway leading to the mezzanine.