Violation Detail
Standard Cited: 19100184 E01 Slings.
Inspection Nr: 1374091.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/10/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/06/2019
Gravity:
Report ID: 0626300
Contest Date:
Final Order: 05/31/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/31/2019 | $0.00 | 06/06/2019 | Other | |
Penalty | Z: Issued | 05/10/2019 | $0.00 | 06/06/2019 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.184(e)(1): Alloy steel sling(s) did not have permanently affixed durable identification stating size, grade, rated capacity, and reach: (a) On or about April 10, 2019 an alloy steel chain sling attached to overhead crane CR 12 did not have a permanently affixed and durable identification tag; in that, the size and reach of the sling were unrecognizable on the tag affixed to the sling. This made proper inspection of the sling impossible and exposed employees using the sling twice a night, lifting loads up to 18,249 pounds, to a crushed-by hazard.