Violation Detail
Standard Cited: 19260501 B13 Duty to have fall protection.
Inspection Nr: 1370311.015
Citation: 02001
Citation Type: Willful
Abatement Status: Abatement Completed
Initial Penalty: $58,343.00
Current Penalty: $34,797.00
Issuance Date: 04/03/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 04/29/2019
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 04/30/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/30/2019 | $34,797.00 | 04/29/2019 | Willful | |
Penalty | Z: Issued | 04/03/2019 | $58,343.00 | 04/29/2019 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501(b): a) Building 800 - An employee was observed installing soffit and fascia board on the roof of an apartment building and was not protected from an approximate 40 foot fall hazard to the ground below, on or about January 9, 2019. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.