Violation Detail
Standard Cited: 19261101 F02 I Asbestos
Inspection Nr: 1352314.015
Citation: 02001
Citation Type: Repeat
Abatement Status: Corrected During Inspection
Initial Penalty: $18,108.00
Current Penalty: $13,581.00
Issuance Date: 12/10/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 10
Report ID: 0523300
Contest Date:
Final Order: 01/08/2019
Related Event Code (REC): R
Emphasis:
Substance: 9020
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/08/2019 | $13,581.00 | Repeat | ||
Penalty | Z: Issued | 12/10/2018 | $18,108.00 | Repeat |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.1101(f)(2)(i): The employer with a work operation covered by the asbestos standard did not ensure that a "competent person" conducted an exposure assessment immediately before or at the initiation of the operation to ascertain expected exposures during that operation or workplace: On or about October 02, 2018 employees removed asbestos containing ceiling tiles and an asbestos exposure assessment was not performed before or at the initiation of removing asbestos containing ceiling tiles. Mavo Systems, Inc. was previously cited for a violation of this Occupational Safety and Health Standard 29 CFR 1926.1101(f)(2)(i), which was contained in OSHA inspection number 991449, citation number 1, item 1a and was affirmed as a final order on October 31, 2014, with respect to a workplace located at 124 Graham Street, Eau Claire, WI 54703.