Violation Detail
Standard Cited: 19260850 B Preparatory operations.
Inspection Nr: 1320105.015
Citation: 02001
Citation Type: Willful
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $28,454.00
Current Penalty: $19,064.18
Issuance Date: 12/03/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 12/07/2018
Gravity: 10
Report ID: 0317000
Contest Date:
Final Order: 01/02/2019
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/02/2019 | $19,064.18 | 12/07/2018 | Willful | |
Penalty | Z: Issued | 12/03/2018 | $28,454.00 | 12/07/2018 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.850(b): The walls or floors were not shored or braced where employee(s) were required to work within a damaged structure to be demolished. a) Jobsite: Interior of structure, 2nd floor, rear room - The employer did not shore or brace the damaged walls of the structure where employees were conducting manual demolition operations exposing them to collapse hazards. Noted on or about 6/4/18.