Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 129446274
Citation: 02001
Citation Type: Other
Abatement Status: X
Initial Penalty: $350.00
Current Penalty: $245.00
Issuance Date: 06/05/1998
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 06/09/1998
Gravity: 00
Report ID: 0552700
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/25/1998 | $245.00 | 06/09/1998 | Other | |
| Penalty | Z: Issued | 06/05/1998 | $350.00 | 06/09/1998 | Other |
Translate