Violation Detail
Standard Cited: 19100178 A04 Powered industrial trucks.
Inspection Nr: 1290750.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/06/2018
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 05/30/2018
Gravity:
Report ID: 0521700
Contest Date:
Final Order: 04/03/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/03/2018 | $0.00 | 05/30/2018 | Other | |
| Penalty | Z: Issued | 03/06/2018 | $0.00 | 03/30/2018 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.178(a)(4): Modifications and additions which affect capacity and safe operation of powered industrial truck were performed by the employer without the manufacturer's prior written approval. Shipping/Receiving: On or about January 12, 2018, a forklift operator used a carpet needle attachment to move rolls of carpet on the Hyster sit down forklift (s/n - A268N16122N)without the manufacturer's prior written approval. Certification, with date and method of abatement required. Certification of abatement is required by 29 CFR Part 1903 and is to be submitted within (10) calendar days after the abatement date.
Translate