Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1281103.015
Citation: 02001
Citation Type: Other
Abatement Date: 09/25/2018 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/30/2018
Nr Instances: 1
Nr Exposed: 15
Related Event Code (REC):
Gravity:
Report ID: 0316700
Contest Date:
Final Order: 06/21/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/21/2018 | $0.00 | 09/25/2018 | Other | |
Penalty | Z: Issued | 05/30/2018 | $0.00 | 06/25/2018 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.37(a)(3): Exit route(s) were not kept free and unobstructed: a) Building 24 - Employees did not have a clear path to exit the building. The employer did not ensure that exit routes were kept free of hazards and unobstructed so employee egress was not hindered, on or before December 1, 2017 Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records. ------------------------------------------------------------------ AVD MODIFIED VIA ISA ON 6/21/18 a) Floor truss building #24 Employees did not have a clear path to exit the building. The employer did not ensure that exit routes were kept free and unobstructed so employee egress was not hindered, on December 1, 2017