Violation Detail
Standard Cited: 19260451 C02 IV General requirements.
Inspection Nr: 1256203.015
Citation: 02001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $49,797.00
Current Penalty: $12,675.00
Issuance Date: 08/28/2017
Nr Instances: 1
Nr Exposed: 14
Abatement Date: 09/26/2017
Gravity: 5
Report ID: 0636900
Contest Date:
Final Order: 09/26/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/26/2017 | $12,675.00 | 09/26/2017 | Serious | |
Penalty | Z: Issued | 08/28/2017 | $49,797.00 | 09/26/2017 | Repeat |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.451(c)(2)(iv): Front-end loaders and similar pieces of equipment were used to support scaffold platforms when they were not specifically designed by the manufacturer for such use: At a residential construction jobsite, employees were working from a work platform, elevated by a Genie Tele-handler, Model GTH-844 rough-terrain-forklift, that was not approved and or designed by the manufacturer to be used with the GTH-844 tele-handler. Central Texas Lath & Plaster, LP was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29 CFR 1926.451(c)(2)(iv), which was contained in OSHA inspection number 998957, citation number 1, item number 1 and was affirmed as a final order on 12/18/2014 with a final abatement date of 01/02/2015, with respect to a workplace located at 122 Ray Smith, San Antonio, Texas 78215.