Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1243269.015
Citation: 02001
Citation Type: Other
Abatement Date: 10/02/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/15/2017
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity:
Report ID: 0418100
Contest Date:
Final Order: 09/06/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/06/2017 | $0.00 | 10/02/2017 | Other | |
Penalty | Z: Issued | 08/15/2017 | $0.00 | 10/02/2017 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: Anchor Glass Container Corporation, Warner Robins, GA - The employer had designated a roll-up door as an emergency exit for employees working in the warehouse. The roll-up door had to be opened with a chain on a gear required to be pulled, on or about 6/30/17.