Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1236739.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/14/2017
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 08/09/2017
Gravity:
Report ID: 0316700
Contest Date:
Final Order: 08/02/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/02/2017 | $0.00 | 08/09/2017 | Other | |
| Penalty | Z: Issued | 07/14/2017 | $0.00 | 08/09/2017 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling; a) Spiral Department - The employer did not ensure that the 4 inch gang box hanging behind the power rotary machine was properly mounted in accordance with manufactures instructions, thereby, exposing employees to struck-by, caught in or electrical hazards on or before May 10, 2017. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Translate