Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1219884.015
Citation: 02001
Citation Type: Other
Abatement Date: 06/23/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/30/2017
Nr Instances: 3
Nr Exposed: 100
Related Event Code (REC):
Gravity:
Report ID: 0215800
Contest Date:
Final Order: 06/26/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/26/2017 | $0.00 | 06/23/2017 | Other | |
Penalty | Z: Issued | 05/30/2017 | $0.00 | 06/23/2017 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.36(d)(1): Exit door(s) were locked. Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a) Factory floor, main evacuation route, on or about 3/23/17: Two sets of double doors, both marked as an exit, each had the right side door locked at the top and bottom of the door. b) Main entrance to reception area, on or about 3/23/17: Two sets of double doors, both marked as an exit, each had the right side door locked at the top and bottom of the door. Abatement certification must be submitted for item b.