Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 1215891.015
Citation: 02001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $63,375.00
Current Penalty: $12,934.00
Issuance Date: 09/01/2017
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 09/08/2017
Gravity: 10
Report ID: 0317700
Contest Date: 09/28/2017
Final Order: 08/30/2018
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/30/2018 | $12,934.00 | 09/08/2017 | Serious | |
Penalty | C: Contested | 10/02/2017 | $63,375.00 | 09/08/2017 | Willful | |
Penalty | Z: Issued | 09/01/2017 | $63,375.00 | 09/08/2017 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.850(a): The employer did not ensure that there was written evidence that an engineering survey was performed by a competent person of the structure to determine the conditions of the framing, floors, and walls, and possibility of unplanned collapse of any portion of the structure prior to permitting employees to start demolition operations. a) Jobsite, Kaier Brewery, N. Main St & E. Laurel Sts, Mahanoy City, PA: The employer did not ensure than there was written evidence than an engineering survey was performed by a competent person of the structure to determine the conditions of the of the framing, floors, and walls, and possibility of unplanned collapse of any portion of the structure.