Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1204677.015
Citation: 02001
Citation Type: Serious
Abatement Date: 08/03/2017 2
Initial Penalty: $8,873.00
Current Penalty: $5,323.80
Issuance Date: 07/11/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0418100
Contest Date:
Final Order: 07/28/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/28/2017 | $5,323.80 | 08/03/2017 | Serious | |
Penalty | Z: Issued | 07/11/2017 | $8,873.00 | 08/03/2017 | Serious |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: On or about 1/23/2017 at 2905 Pacific Drive Norcross, GA, the employer failed to create and implement specific procedures for equipment including but not limited to overhead cranes for activities including but not limited to controlling energy sources during rail preparations for transition from inside to outside of the building where the tracks needed to be physically manipulated by-hand while in close proximity to the electrified rails.