Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1200738.015
Citation: 02001
Citation Type: Other
Abatement Date: 3
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/23/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity:
Report ID: 0728900
Contest Date:
Final Order: 06/15/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/15/2017 | $0.00 | Other | ||
Penalty | Z: Issued | 05/23/2017 | $0.00 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.107(b)(5)(i): There were no visible gauges, audible alarms or pressure activated devices installed in paint spray booths to indicate or ensure that the required air speed was maintained. The employer is failing to ensure that employees are not exposed to fire and inhalation hazards. This was most recently documented on January 4, 2017 at 1120 North 18th Street Omaha, Nebraska. The employer is failing to ensure that a device was in place to measure the flow of air across the filters in the paint booth.