Violation Detail
Standard Cited: 19100107 G02 Spray finishing using flammable and combustible materials.
Inspection Nr: 1167646.015
Citation: 02001
Citation Type: Other
Abatement Date: 03/08/2018 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/01/2017
Nr Instances: 2
Nr Exposed: 5
Related Event Code (REC): C
Gravity:
Report ID: 0523300
Contest Date: 02/21/2017
Final Order: 02/08/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/08/2018 | $0.00 | 03/08/2018 | Other | |
Penalty | C: Contested | 02/23/2017 | $0.00 | 02/15/2017 | Other | |
Penalty | Z: Issued | 02/01/2017 | $0.00 | 02/15/2017 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.107(g)(2): All spraying areas were not kept as free from the accumulation of deposits of combustible residues as practical, with cleaning conducted daily if necessary: On or about August 8, 2016, the floors and ceiling areas of spray finishing areas in buildings 20 and 21 were not kept clean of accumulations of combustible paint residues.