Violation Detail
Standard Cited: 19100303 F02 General.
Inspection Nr: 1127562.015
Citation: 02001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/01/2016
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 08/25/2016
Gravity:
Report ID: 0213900
Contest Date: 10/14/2016
Final Order: 11/27/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 05/09/2019 | $0.00 | 08/25/2016 | Other | |
Penalty | J: ALJ Decision | 11/27/2017 | $0.00 | 08/25/2016 | Other | |
Penalty | Z: Issued | 08/01/2016 | $0.00 | 08/25/2016 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: (a) Facility, Closet: The breakers located in the Square D electrical panelboard were not labeled to indicate their purpose, on or about 2/24/2016. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM, FAILURE TO DO SO WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 AS PER 29 CFR 1903.19