Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1103515.015
Citation: 02001
Citation Type: Willful
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $30,800.00
Current Penalty: $30,800.00
Issuance Date: 05/02/2016
Nr Instances: 1
Nr Exposed: 9
Abatement Date: 05/10/2016
Gravity: 10
Report ID: 0317000
Contest Date: 05/27/2016
Final Order: 03/01/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | W: Empr Withdrew | 03/01/2017 | $30,800.00 | 05/10/2016 | Willful | |
Penalty | C: Contested | 08/08/2016 | $30,800.00 | 05/10/2016 | Willful | |
Penalty | Z: Issued | 05/02/2016 | $30,800.00 | 05/10/2016 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a) The employer does not have each working level of a scaffold fully planked or decked between the front uprights and the guardrail supports. This violation was most recently observed at 3018 West Thompson Street, Philadelphia, PA 19121 on November 3, 2015 where employees were performing stucco operations up to approximately thirty-nine (39) feet above the ground from a fabricated frame scaffold that was not fully planked or decked. To abate this ongoing violation, the employer must install decking or planking from the front uprights to the guardrail supports with no more than 1 inch gaps between planks.