Violation Detail
Standard Cited: 19260652 A01 Requirements for protective systems.
Inspection Nr: 1091889.015
Citation: 02001
Citation Type: Willful
Abatement Status: Abatement Completed
Initial Penalty: $49,000.00
Current Penalty: $29,400.00
Issuance Date: 10/28/2015
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 11/17/2015
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 11/24/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/24/2015 | $29,400.00 | 11/17/2015 | Willful | |
Penalty | Z: Issued | 10/28/2015 | $49,000.00 | 11/17/2015 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652(c): a) 516 Main Street, Blandon, PA; Employees were installing a 3/4 inch water line while working in a 5 feet 8 inch deep excavation without the use of cave-in protection, on or about 09/15/2015. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.