Violation Detail
Standard Cited: 19260703 A01 Requirements for cast-in-place Concrete.
Inspection Nr: 1090038.015
Citation: 02001
Citation Type: Willful
Abatement Date: 3
Initial Penalty: $5,000.00
Current Penalty: $5,000.00
Issuance Date: 03/02/2016
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): A
Gravity: 10
Report ID: 0419400
Contest Date:
Final Order: 03/29/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 03/02/2016 | $5,000.00 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.703(a)(1): Formwork was not designed, fabricated, erected, supported, braced and maintained so that it would be capable of supporting without failure all vertical and lateral loads that could reasonably be anticipated to be applied to the form: (a) Construction Site - On or about September 8, 2015 the formwork was not designed for a concrete floor. The approved engineered building plans were not followed for the construction of a wood floor. The building plans called for "Z" purlins on 12-inch center but were switched to "C" purlins on 16-inch center and used for a concrete floor.