Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1083290.015
Citation: 02001
Citation Type: Other
Abatement Date: 11/12/2015 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/28/2015
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity:
Report ID: 1032700
Contest Date:
Final Order: 10/27/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/27/2015 | $0.00 | 11/12/2015 | Other | |
Penalty | Z: Issued | 09/28/2015 | $0.00 | 11/12/2015 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams were not accurate and did not represent equipment that was existing and was part of the process. Engine room: On or about August 3, 2015 and times prior thereto, changes to the flow diagram had not been updated to reflect a change to oil cooler relief system that had been completed by Stellar Corporation.