Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1066677.015
Citation: 02001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $55,000.00
Current Penalty: $6,000.00
Issuance Date: 11/25/2015
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 12/17/2015
Gravity: 5
Report ID: 0111400
Contest Date: 12/21/2015
Final Order: 10/20/2016
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/20/2016 | $6,000.00 | 12/17/2015 | Serious | |
Penalty | C: Contested | 12/22/2015 | $55,000.00 | 12/17/2015 | Willful | |
Penalty | Z: Issued | 11/25/2015 | $55,000.00 | 12/17/2015 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(3)(ii): Point of operation guards were not designed and constructed as to prevent the operator from having any part of their body in the danger zone during the operating cycle: Line 3 Gas House: As a result of the failure to comply with the foregoing, an employee suffered a partial amputation of his finger.