Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1046015.015
Citation: 02001
Citation Type: Willful
Abatement Status: Corrected During Inspection
Initial Penalty: $22,000.00
Current Penalty: $22,000.00
Issuance Date: 07/02/2015
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0213600
Contest Date:
Final Order: 07/30/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 07/02/2015 | $22,000.00 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports: a) On or about 3/6/15 at the Quality Inn & Suites rehabilitation project located at 8200 Park Road, Batavia, New York; employees were using a tubular frame scaffold to apply foam to the front of the building. None of the working levels the employees were using was fully planked or decked. NO ABATEMENT CERTIFICATION REQUIRED