Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1040811.015
Citation: 02001
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 06/08/2015
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity:
Report ID: 0420600
Contest Date:
Final Order: 07/01/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/01/2015 | $0.00 | Other | ||
| Penalty | Z: Issued | 06/08/2015 | $0.00 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.107(b)(5)(i): Visible gauges, audible alarms, or pressure activated devices were not installed to indicate or insure that the required air velocity was maintained: a) Varnish Building - The manometer for the spray booth was not operable, on or about March 5, 2015.
Translate