Violation Detail
Standard Cited: 5A0001 OSH Act General Duty Paragraph
Inspection Nr: 101381796
Citation: 02001
Citation Type: Unclass
Abatement Status: X
Initial Penalty: $9,000.00
Current Penalty: $10,000.00
Issuance Date: 02/25/1991
Nr Instances: 14
Nr Exposed: 180
Abatement Date: 10/31/1992
Gravity: 09
Report ID: 0728900
Contest Date: 03/15/1991
Final Order: 03/16/1992
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/16/1992 | $10,000.00 | 10/31/1992 | Unclass | |
| Penalty | Z: Issued | 02/25/1991 | $9,000.00 | 03/25/1991 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard: CHEMICAL
SECTION 5(A)(1) OF THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970: THE EMPLOYER DID NOT FURNISH EMPLOYMENT AND A PLACE OF EMPLOYMENT WHICH WERE FREE FROM REOGNIZED HAZARDS THAT WERE CAUSING OR LIKELY TO CAUSE DEATH OR SERIOUS PHYSICAL HARM TO EMPLOYEES IN THAT EMPLOYEES WERE EXPOSED TO FIRE, EXPLOSION, STEAM AND CHEMICAL BURNS AND TOXIC VAPOR HAZARDS FROM: A) SAFETY RELIEF VALVE STACK WHICH WOULD RELEASE AMMONIA FROM THE STORAGE REFRIGERATION COMPRESSOR AND THE AMMONIA CONDENSER AT THE NORTH SIDE DIKE OF THE STORAGE FACILITIES INTO THE WORK AREA; B) SAFETY RELIEF VALVE WHICH WOULD RELEASE HYDROGEN GAS AT WASTE HEAT BOILER E-307 INTO WORK AREAS. C) TWO SAFETY RELIEF VALVES WHICH WOULD RELEASE STEAM AT WASTE HEAT BOILER E-307 INTO WORK AREAS. D) TWO SAFETY RELIEF VALVES WHICH WOULD RELEASE HYDROGEN AT THE LOW TEMPERATURE SHIFT CONVERTER INTO WORK AREAS. E) SAFETY RELIEF VALVE WHICH WOULD RELEASE MEA AT MEA FLASH TANK V-307 INTO WORK AREAS. F) SAFETY RELIEF VALVE WOULD RELEASE HYDROGEN AT METHANATOR FEED/ EFFLUENT HEAT EXCHANGER E-310 INTO WORK AREAS. G) SAFETY RELIEF VALVE WHICH WOULD RELEASE AMMONIA AT THE UREA PRIMARY ABSORBER INTO WORK AREAS. H) SAFETY RELIEF VALVE WHICH WOULD RELEASE AMMONIA AT THE UREA SECONDARY ABSORBER INTO WORK AREAS. I) SAFETY RELIEF VALVE WHICH WOULD RELEASE AMMONIA AT THE UREA HIGH PRESSURE OFF GAS SEPARATOR INTO WORK AREAS. J) SAFETY RELIEF VALVE WHICH WOULD RELEASE AMMONIA AT THE UREA PRIMARY DECOMPOSER SEPARATOR INTO WORK AREA. K) SAFETY RELIEF VALVE WHICH WOULD RELEASE AMMONIA AT THE UREA SECONDARY DECOMPOSER SEPARATOR INTO THE WORK AREAS. L) SAFETY RELIEF VALVE WHICH WOULD RELEASE MEA AT THE UREA MEA RECLAIMER INTO WORK AREAS. M) THREE SAFETY RELIEF VALVES WHICH COULD RELEASE HYDROGEN OFF TRAIN I COMPRESSORS INTO WORK AREAS. N) SAFETY RELIEF VALVES WHICH WOULD RELEASE AMMONIA AT THE UREA PRIMARY DECOMPOSER AMMONIA SEPARATOR (SE-150) INTO THE WORK AREA AMONG OTHER METHODS, FEASIBLE AND ACCEPTABLE ABATEMENT METHOD TO CORRECT THESE HAZARDS IS: 1) TO DISCHAGE SAFETY RELIEF VALVE VENTS TO A SAFE LOCATION, 2) ASSURE THAT THE DISCHARGE VENTS CANNOT BE DIVERTED INTO WORK AREAS, AREAS, AND 3) ADD WATER/STEAM DILUTION SYSTEMS TO THE DISCHARGE VENTS WHERE SOLIDS FORMATION PRESENTS POTENTIAL FOR PLUGGING.