Violation Detail
Standard Cited: 19100219 C02 I Mechanical power-transmission apparatus.
Inspection Nr: 451379.015
Citation: 01054
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,500.00
Current Penalty: $5,000.00
Issuance Date: 11/26/2012
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 12/06/2012
Gravity: 5
Report ID: 0522500
Contest Date: 12/12/2012
Final Order: 03/10/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/13/2014 | $5,000.00 | 12/06/2012 | Serious | |
| Penalty | C: Contested | 12/19/2012 | $5,500.00 | 12/06/2012 | Serious | |
| Penalty | Z: Issued | 11/26/2012 | $5,500.00 | 12/06/2012 | Serious |
Text For Citation: 01 Item/Group: 054 Hazard:
29 CFR 1910.219(c)(2)(i): All exposed parts of horizontal shafting seven (7) feet or less from floor or working platform, excepting runways used exclusively for oiling, or running adjustments, shall be protected by a stationary casing enclosing shafting completely or by a trough enclosing sides and top or sides and bottom of shafting as location requires: a. On August 23, 2012, in the1P chlorination building #6, an exposed horizontal shaft was not completely enclosed on the 40R reactor circulation pump motor.
Translate