Violation Detail
Standard Cited: 19100303 B07 General.
Inspection Nr: 1207843.015
Citation: 01039A
Citation Type: Serious
Abatement Date: 02/02/2018 2
Initial Penalty: $5,070.00
Current Penalty: $2,433.00
Issuance Date: 06/26/2017
Nr Instances: 3
Nr Exposed: 22
Related Event Code (REC):
Gravity: 5
Report ID: 0215800
Contest Date: 07/09/2017
Final Order: 02/02/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/02/2018 | $2,433.00 | 02/02/2018 | Serious | |
Penalty | C: Contested | 07/26/2017 | $5,070.00 | 07/07/2017 | Serious | |
Penalty | Z: Issued | 06/26/2017 | $5,070.00 | 07/07/2017 | Serious |
Text For Citation: 01 Item/Group: 039A Hazard:
29 CFR 1910.303(b)(7): Electric equipment was not installed in a neat and workmanlike manner: a) On or about 1/31/2017, Machine room: Electrical cables were draped over metal braces of the structure, on the drive side of the paper machine, and were unsupported for distances between eight feet and twelve feet. b) On or about 2/7/2017, Basement: Electrical cables energizing 480 Volt motors located below the wet end, were unsupported for distances of up to eighteen feet. c) On or about 2/7/2017, Basement: Electrical connections for the winder hydraulic pump below the dry end were made outside of a box and unprotected from damage. Abatement certification is required for this item.