Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 314767104
Citation: 01035
Citation Type: Serious
Abatement Date: 03/31/2011 X
Initial Penalty: $2,500.00
Current Penalty: $2,500.00
Issuance Date: 03/14/2011
Nr Instances: 1
Nr Exposed: 23
Related Event Code (REC):
Gravity: 05
Report ID: 0625700
Contest Date: 04/04/2011
Final Order: 04/11/2012
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/11/2012 | $2,500.00 | Serious | ||
Penalty | Z: Issued | 03/14/2011 | $2,500.00 | Serious |
Text For Citation: 01 Item/Group: 035 Hazard: REFINERY
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: The employer does not ensu re that periodic inspections of each energy control procedure are conducted at l east annually by an authorized employee. The refinery contains numerous vessels and pieces of equipment, all with different specific energy control procedures, that require a separate periodic inspection. The periodic inspections were not c onducted annually by an authorized employee to ensure that the procedure and the requirements of the standard are being followed. This violation was documented on September 22, 2010. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in complianc e with the standard, including the steps that it is taking to ensure that employ ees are not being exposed to potential sources of hazardous energy.