Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1113807.015
Citation: 01031B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 06/17/2016
Nr Instances: 4
Nr Exposed: 33
Abatement Date: 12/31/2017
Gravity: 5
Report ID: 0522500
Contest Date: 07/07/2016
Final Order: 01/17/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/17/2018 | $0.00 | 12/31/2017 | Serious | |
Penalty | C: Contested | 07/11/2016 | $0.00 | 07/22/2016 | Serious | |
Penalty | Z: Issued | 06/17/2016 | $0.00 | 07/22/2016 | Serious |
Text For Citation: 01 Item/Group: 031B Hazard:
29 CFR 1910.147(c)(4)(ii): The procedures shall clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, the following: a. The employer failed to develop procedures to prevent the inadvertent startup or release of stored energy, with a specific statement of the intended use of the procedure. b. The employer failed to develop procedures to prevent the inadvertent startup or release of stored energy, with specific procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. c. The employer failed to develop procedures to prevent the inadvertent startup or release of stored energy, with specific procedural steps for the placement, removal and transfer of lockout devices or tag-out devices and the responsibility for them. d. The employer failed to develop procedures to prevent the inadvertent startup or release of stored energy, with specific requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control measures.