Violation Detail
Standard Cited: 19100304 G05 Wiring design and protection.
Inspection Nr: 1059368.015
Citation: 01031
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $5,000.00
Current Penalty: $2,500.00
Issuance Date: 09/22/2015
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 07/15/2016
Gravity: 5
Report ID: 0213900
Contest Date: 10/14/2015
Final Order: 06/03/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 06/03/2016 | $2,500.00 | 07/15/2016 | Serious | |
Penalty | C: Contested | 10/19/2015 | $5,000.00 | 10/14/2015 | Serious | |
Penalty | Z: Issued | 09/22/2015 | $5,000.00 | 10/14/2015 | Serious |
Text For Citation: 01 Item/Group: 031 Hazard:
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: a) 9000 River Rd, Delair, NJ- Building 4: The path to ground was not continuous on an industrial fan, model # MAC-42-320-3209-C7-J1, Serial #13618491, the ground pin was missing, observed on or about 5/13/2015. b)9000 River Rd, Delair, NJ- Anodizing Area: The path to ground was not continuous on an industrial fan, model # MAC-42-320-3209-C7-J1, the ground pin was missing, observed on or about 5/13/2015. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.