Violation Detail
Standard Cited: 19100119 F01 I G Process safety management of highly hazardous chemicals.
Inspection Nr: 451379.015
Citation: 01028
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $7,000.00
Issuance Date: 11/26/2012
Nr Instances: 3
Nr Exposed: 87
Abatement Date: 09/30/2014
Gravity: 10
Report ID: 0522500
Contest Date: 12/12/2012
Final Order: 03/10/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/10/2014 | $7,000.00 | 09/30/2014 | Serious | |
| Penalty | C: Contested | 12/19/2012 | $0.00 | 02/27/2013 | Serious | |
| Penalty | Z: Issued | 11/26/2012 | $0.00 | 02/27/2013 | Serious |
Text For Citation: 01 Item/Group: 028 Hazard:
29 CFR 1910.119(f)(1)(i)(G): The employer shall develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and shall address at least the following elements: Startup following a turnaround, or after an emergency shutdown: a. In the chlorination department 1C building #17, 1C-27, 18 & 19 Reactors Shut Down Procedure failed to address restart after emergency shutdown. 1C-26, 20 Reactor Shut Down Procedure lacked specificity for restart following emergency shutdown. b. In the phosphites plant building #27, the startup following a turnaround or emergency shutdown, such as SOPM 152, Power Failure Emergency Shutdown, did not address the 32R reactor process. c. In the chlorination department 1P building #6, the following procedures failed to address restart following emergency shutdown: 1P-03B, #1 and #2 Reactor Shutdown Procedures; 1P-03C, #4 Reactor Operating Procedure & 1P-03D, #5 Reactor Operating Procedure.