Violation Detail
Standard Cited: 19100305 G02 III Wiring methods, components, and equipment for general use.
Inspection Nr: 1298240.015
Citation: 01027A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,315.00
Current Penalty: $6,652.00
Issuance Date: 08/16/2018
Nr Instances: 3
Nr Exposed: 10
Abatement Date: 09/05/2018
Gravity: 5
Report ID: 0522500
Contest Date: 09/18/2018
Final Order: 08/07/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/07/2019 | $6,652.00 | 09/05/2018 | Serious | |
Penalty | C: Contested | 09/19/2018 | $8,315.00 | 09/05/2018 | Serious | |
Penalty | Z: Issued | 08/16/2018 | $8,315.00 | 09/05/2018 | Serious |
Text For Citation: 01 Item/Group: 027A Hazard:
29 CFR 1910.305(g)(2)(iii): Flexible cords and cables shall be connected to devices and fittings so that strain relief is provided that will prevent pull from being directly transmitted to joints or terminal screws: a. On or about February 28, 2018, located in the Maintenance Shop, employees operated a Rigid pipe threader that was supplied with electrical power from an extension cord that was plugged into a portable electrical outlet box that did not have strain relief provided for its flexible cord, thereby exposing the employees to an electrical shock hazard of 120 VAC. b. On or about April 10, 2018, located in the Mandrel Hose Geese Finishing Room, employees operated a Dayton pedestal grinder that had a flexible cord that did not have strain relief provided at its plug, thereby exposing employees to an electrical shock of 120 VAC. c. On or about April 19, 2018, located in the Vulcanizing Department at Smaco splicing press #37, there was a flexible cord that provided power to the heater box that did not have strain relief provided at its cord plug, thereby exposing employees to an electrical shock hazard of 120 VAC.