Violation Detail
Standard Cited: 19100305 G01 IVA Wiring methods, components, and equipment for general use.
Inspection Nr: 315973891
Citation: 01027
Citation Type: Other
Abatement Status: X
Initial Penalty: $3,300.00
Current Penalty: $3,000.00
Issuance Date: 05/31/2012
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 06/19/2012
Gravity: 01
Report ID: 0627100
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/21/2012 | $3,000.00 | 06/19/2012 | Other | |
| Penalty | Z: Issued | 05/31/2012 | $3,300.00 | 06/19/2012 | Serious |
Text For Citation: 01 Item/Group: 027 Hazard: CHEMNEP
29 CFR 1910.305(g)(1)(iv)[A]: The employer did not ensure that flexible cords and cables were not used as a substitute for the fixed wiring of a structure. Employer does not ensure that flexible cords are not used in lieu of fixed wiring for a structure. On or about February 15, 2012 and times prior thereto the fixed oil drain tank in the north engine room is powered via an extension cord. The cord lays on the floor adjacent to the tank and presents a trip hazard to employees. Pursuant to 29 CFR 1903.19 within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that extension cords are not used in lieu of permanent wiring for a fixed structure.