Standard Cited: 19100119 L05 Process safety management of highly hazardous chemicals.
Inspection Nr: 311917009
Citation: 01027
Citation Type: Serious
Abatement Status: X
Initial Penalty: $5,000.00
Current Penalty: $5,000.00
Issuance Date: 05/13/2009
Nr Instances: 1
Nr Exposed: 20
Abatement Date: 06/29/2009
Gravity: 10
Report ID: 0213400
Contest Date: 06/03/2009
Final Order: 12/24/2009
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | R: Review Commission | 12/24/2009 | $5,000.00 | 06/29/2009 | Serious | |
| Penalty | J: ALJ Decision | 08/28/2009 | $5,000.00 | 06/29/2009 | Serious | |
| Penalty | Z: Issued | 05/13/2009 | $5,000.00 | 06/29/2009 | Serious |
Text For Citation: 01 Item/Group: 027 Hazard: REFINERY
629 CFR 1910.119(l)(5): A change covered by 29 CFR 1910.119(l) resulted in a change in the operating procedures or practices required by 29 CFR 1910.119(f) and such procedures or practices were not updated: a- Hess Port Reading Refinery, FCCU - Project No. 1182 and associated MOC included making the temporary level indicator on R-502R Regenerator a permanent installation. Written operating procedures to include 15-5.801 FCCU Training Manual and #1 Console Training Manual (Unit, 1 500 Fluid Catalytic Cracking) were not updated to reflect this change. Condition noted on or about 02/10/09.