Violation Detail
Standard Cited: 19100147 C06 IA The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 313130833
Citation: 01025
Citation Type: Serious
Abatement Status: X
Initial Penalty: $4,500.00
Current Penalty:
Issuance Date: 04/16/2010
Nr Instances: 1
Nr Exposed: 12
Abatement Date: 04/29/2010
Gravity: 10
Report ID: 0523300
Contest Date: 05/07/2010
Final Order: 09/06/2011
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 09/06/2011 | 04/29/2010 | Serious | ||
| Penalty | Z: Issued | 04/16/2010 | $4,500.00 | 04/29/2010 | Serious |
Text For Citation: 01 Item/Group: 025 Hazard: CHEMNEP
29 CFR 1910.147(c)(6)(i) (A): The periodic inspection of the energy control procedure was not performed by an authorized employee other than the one utilizing the energy control procedure being inspected: The periodic inspection of energy control procedures was performed by the same person utilizing the energy control procedure being inspected.