Violation Detail
Standard Cited: 19100261 K01 Pulp, paper, and paperboard mills.
Inspection Nr: 1446527.015
Citation: 01025
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,145.00
Current Penalty: $9,108.75
Issuance Date: 04/17/2020
Nr Instances: 1
Nr Exposed: 20
Abatement Date: 05/20/2020
Gravity: 10
Report ID: 0111700
Contest Date:
Final Order: 05/11/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/11/2020 | $9,108.75 | 05/20/2020 | Serious | |
Penalty | Z: Issued | 04/17/2020 | $12,145.00 | 05/20/2020 | Serious |
Text For Citation: 01 Item/Group: 025 Hazard:
29 CFR 1910.261(k)(1): Emergency stop buttons and pull cords on the paper machines were not located in such a matter that was easily accessible for any person working on the machine to quickly disconnect the machine from the source of power in case of emergency: Paper Machine #9- Employees were not protected from severe laceration, amputation and crushing hazards where emergency stop buttons and pull cords were not located in such a manner that was easily accessible for employees working on the paper machine on the main working level and in the basement. On or about November 21, 2019, employees in the basement were reaching into the paper machine, using a hose to spray water on the crepe set roll, to make a guide adjustment where emergency stop buttons and pull cords were not located.