Powered by GoogleTranslate

Violation Detail

Standard Cited: 19100119 J04 II Process safety management of highly hazardous chemicals.

Inspection Nr: 311917009

Citation: 01023

Citation Type: Serious

Abatement Status: X

Initial Penalty: $5,000.00

Current Penalty: $5,000.00

Issuance Date: 05/13/2009

Nr Instances: 3

Nr Exposed: 10

Abatement Date: 09/30/2010

Gravity: 10

Report ID: 0213400

Contest Date: 06/03/2009

Final Order: 12/24/2009

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty R: Review Commission 12/24/2009 $5,000.00 09/30/2010 Serious  
Penalty J: ALJ Decision 08/28/2009 $5,000.00 09/30/2010 Serious  
Penalty Z: Issued 05/13/2009 $5,000.00 06/29/2009 Serious  

Text For Citation: 01 Item/Group: 023 Hazard: REFINERY

29 CFR 1910.119(j)(4)(ii): Inspections and testing procedures performed on process equipment to maintain its mechanical integrity did not follow recognized and generally accepted good engineering practices (RAGAGEP): a- Hess Port Reading Refinery, FCCU, Gas Con, Alky - The employer did not comply with API 510 Section 6.6 requirements when it failed to reduce the inspection frequency of pressure relieving devices which were heavily fouled or stuck in the last inspection or test. Such valves included but were not limited to RV-D-603-1, RV-E- 603-RT, RV-E-610-R, RV-E-622-T, RV-E-627, RV-S-603-2, RV-T-620-1, RV-D- 710, RV-E-708-T, RV-P-712A, RV-P-722, RV-E-501-BR-2S, RV-E-502-BR-T, RV- E-504-R-S, RV-P-501A/B, RV-S-512 and RV-SC-559-1. Conditions noted on or about 03/03/09 and 03/09/09. b- Hess Port Reading Refinery, FCCU, Gas Con, Alky - The employer did not comply with API 510 Section 6.6 requirements when it allowed inspection intervals on equipment RVs in fouling service to exceed 5 years. Such valves included but were not limited to RV-S-603C, RV-D-612, RV-E-608-R, RV-T-622, RV-D-705-1, RV-P-712B, RV-T-702A, RV-D-507-R-1, RV-E-502-BR-T and RV-E-504-R-S. Conditions noted on or about 03/03/09 and 03/09/09. c- Hess Port Reading Refinery, FCCU, Gas Con, Alky - The employer did not comply with API 574 Section 6.3.3.2 requirements when it failed to ensure that insulation plugs were replaced and sealed after taking piping thickness measurements on insulated piping. Insulation plugs were missing from process piping found in but not limited to the following drawings: 700-07A, 700-7B, 700-08, 700-30A, 700-52, 700-54, 700-66, 700-73, 700-76, 700-96, 600-24, 600-45, 600-112, 600-132, 600- 133, 500-5, 500-08A, 500-9, 500-13, 500-13, 500-18, 500-27, 500-39, 500-45, 500- 47 and 500-56. Condition noted on or about 12/16/08 and 02/27/09.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close