Violation Detail
Standard Cited: 19100305 G02 III Wiring methods, components, and equipment for general use.
Inspection Nr: 1190055.015
Citation: 01023
Citation Type: Serious
Abatement Date: 06/02/2017 4
Initial Penalty: $2,173.00
Current Penalty: $2,173.00
Issuance Date: 04/28/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 1
Report ID: 0626700
Contest Date: 05/19/2017
Final Order: 10/12/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | W: Empr Withdrew | 10/12/2017 | $2,173.00 | 06/02/2017 | Serious | |
Penalty | C: Contested | 05/22/2017 | $2,173.00 | 06/02/2017 | Serious | |
Penalty | Z: Issued | 04/28/2017 | $2,173.00 | 06/02/2017 | Serious |
Text For Citation: 01 Item/Group: 023 Hazard:
29 CFR 1910.305(g)(2)(iii): Flexible cords were not connected to devices and fittings so that tension would not be transmitted to joints or terminal screws: a) In the wash bay: Strain relief was not provided for the 110V cable to the upstairs break room air conditioning unit, exposing employees to a shock hazard. b) In the wash bay: Strain relief was not provided for the 110V cable to the Allegro portable ventilator, exposing employees to a shock hazard. c) In the wash bay: Strain relief was not provided for the 240 V cable to the Alkota steam cleaning unit, exposing employees to a shock hazard.