Violation Detail
Standard Cited: 19100213 S06 Woodworking machinery requirements.
Inspection Nr: 1056557.015
Citation: 01022
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,700.00
Current Penalty: $1,350.00
Issuance Date: 10/09/2015
Nr Instances: 7
Nr Exposed: 7
Abatement Date: 11/14/2015
Gravity: 1
Report ID: 0215800
Contest Date: 10/30/2015
Final Order: 04/04/2016
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 04/04/2016 | $1,350.00 | 11/14/2015 | Serious | |
| Penalty | C: Contested | 10/30/2015 | $2,700.00 | 11/14/2015 | Serious | |
| Penalty | Z: Issued | 10/09/2015 | $2,700.00 | 11/14/2015 | Serious |
Text For Citation: 01 Item/Group: 022 Hazard:
29 CFR 1910.213(s)(6): Cleanliness around woodworking machinery was not maintained to prevent fire hazards: a) Sawmill, on or about 4/14/15: There was an accumulation of wood dust throughout the sawmill around saws and in the cellar of the sawmill. b) Rough Mill, Front Room, on or about 4/15/15: There was an accumulation of wood dust around the Cain panel saw, Komo CNC router 508R and the Komo CNC router 508Q. c) Wood Shop, on or about 4/15/15: There was an accumulation of wood dust around the timesaver machine. d) Finishing, Upfront, Hand Sand, on or about 4/16/15: There was an accumulation of wood dust on the motor for the lift. e) UFB Bldg., on or about 4/16/15: There was an accumulation of wood dust around the Northwood CNC router. f) UFB Bldg., on or about 4/16/15: There was an accumulation of wood dust around the Tannewitz bandsaw created by the exhaust pipe being disconnected. g) UFB Bldg., Second floor, on or about 4/16/15: There was an accumulation of wood dust around the belt sanding machine on the floor, motors, and horizontal surfaces. Abatement certification must be submitted for items a, b, c, g.
Translate