Powered by GoogleTranslate

Violation Detail

Standard Cited: 19100305 B01 II Wiring methods, components, and equipment for general use.

This violation item has been deleted.

Inspection Nr: 940809.015

Citation: 01021

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $2,000.00

Current Penalty: $0.00

Issuance Date: 11/16/2012

Nr Instances: 3

Nr Exposed: 12

Abatement Date: 12/13/2012

Gravity: 5

Report ID: 0728500

Contest Date: 12/10/2012

Final Order: 02/04/2014

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty F: Formal Settlement 02/04/2014 $0.00 12/13/2012 Serious  
Penalty C: Contested 09/11/2013 $2,000.00 12/13/2012 Serious  
Penalty Z: Issued 11/16/2012 $2,000.00 12/13/2012 Serious  

Text For Citation: 01 Item/Group: 021 Hazard:

29 CFR 1910.305(b)(1)(ii): Unused openings in boxes, cabinets, or fittings were not effectively closed: (a) Near the Brewco Saw a control panel had an opening 2" in diameter on the upper right side of the electrical box open; (b) Near the Brewco Saw a control panel had an opening 1 1/2" in diamter on the lower right side of the electrical box open; and (c) On the sorting chain on the west side near the south end, the emergency stop button had a hole in the side of the box left open.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close