Violation Detail
Standard Cited: 19100219 C04 I Mechanical power-transmission apparatus.
Inspection Nr: 941314.015
Citation: 01020
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,400.00
Current Penalty: $2,900.00
Issuance Date: 03/07/2014
Nr Instances: 4
Nr Exposed: 10
Abatement Date: 05/02/2014
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 03/27/2014
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/27/2014 | $2,900.00 | 05/02/2014 | Serious | |
Penalty | Z: Issued | 03/07/2014 | $4,400.00 | 04/02/2014 | Serious |
Text For Citation: 01 Item/Group: 020 Hazard:
29 CFR 1910.219(c)(4)(i): Projecting shaft ends shall present a smooth edge and end and shall not project more than one-half the diameter of the shaft unless guarded by nonrotating caps or safety sleeves. On or about 9/11/13, in the production area at 1 Lemon Lane, Atlanta, the employer did not ensure projecting shaft ends were guarded. Instances included: 1 - at Old Cookie Oven conveyor cleaning system 2 - at Packaging Line 4 conveyor 3 - at New Cookie Oven conveyor cleaning system 4 - New Cookie Oven - 15 count In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).