Violation Detail
Standard Cited: 19100119 D03 I F Process safety management of highly hazardous chemicals.
Inspection Nr: 451379.015
Citation: 01020
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $7,000.00
Issuance Date: 11/26/2012
Nr Instances: 12
Nr Exposed: 87
Abatement Date: 01/28/2013
Gravity: 10
Report ID: 0522500
Contest Date: 12/12/2012
Final Order: 03/10/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/10/2014 | $7,000.00 | 01/28/2013 | Serious | |
| Penalty | C: Contested | 12/19/2012 | $0.00 | 01/28/2013 | Serious | |
| Penalty | Z: Issued | 11/26/2012 | $0.00 | 01/28/2013 | Serious |
Text For Citation: 01 Item/Group: 020 Hazard:
29 CFR 1910.119(d)(3)(i)(F): Process Safety Information. Information pertaining to the equipment in the process shall include: Design codes and standards employed: Information was not compiled for the following process equipment regarding design codes and standards employed, including but not limited to: a. Chlorination 40R reactor process: the design codes and standards employed for the vessels associated with this process were not listed. b. Chlorination 20 reactor process: the design codes and standards employed for the vessels were not listed. c. Chlorination 18R/19R reactor process: the design codes and standards employed for the vessels were not listed. d. Chlorination 49R reactor process: the design codes and standards employed for the vessels were not listed. e. Chlorination 4R/5R reactor process: the design codes and standards employed for the vessels and non-chlorine piping were not listed. f. Chlorination 1R/2R reactor process: none. g. Chlorination 45R reactor and 1P Acid Absorber system process: the design codes and standards employed for the vessels were not listed. h. Phosphites 75R reactor process: none listed. i. Phosphites 34R reactor process: the design codes and standards employed for the vessels are not listed. j. Phosphites 35R reactor process: the design codes and standards employed for the vessels were not listed. k. Phosphites 44R reactor process: the design codes and standards employed for the vessels were not listed. l. Phosphites 72R reactor process: none listed.
Translate