Violation Detail
Standard Cited: 19100119 M02 Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 311907711
Citation: 01020
Citation Type: Serious
Abatement Date: 04/07/2009
Initial Penalty: $2,250.00
Current Penalty: $2,250.00
Issuance Date: 03/05/2009
Nr Instances: 2
Nr Exposed: 384
Related Event Code (REC):
Gravity: 03
Report ID: 0830500
Contest Date: 03/24/2009
Final Order: 11/12/2009
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/12/2009 | $2,250.00 | 04/07/2009 | Serious | |
Penalty | Z: Issued | 03/05/2009 | $2,250.00 | 04/07/2009 | Serious |
Text For Citation: 01 Item/Group: 020 Hazard: EXPLOSION
29 CFR 1910.119(m)(2): Incident investigations were not initiated as promptly as possible, but not later than 48 hours following the incident: (a)Suncor Energy (U.S.A.), Inc., 5801 Brighton Blvd., Commerce City, Colorado: A release to atmosphere involving D-73 and W-36 in the #1 Crude unit occurred on or about December 16, 2008 and was not assigned to a person for investigation until December 19, 2008 and was not assigned to a team for investigation until on or about January 8, 2009. Delay of investigation increases employee exposure to the hazards of hydrogen sulfide, fire, and explosion due to loss of containment. (b)Investigation of an overpressure of TK400 which occurred on or about August 1, 2008, did not begin until August 15, 2008. Delay of investigation increases employee exposure to the hazards of hydrogen sulfide, fire, and explosion due to loss of containment. Abatement Note: Abatement certification is required for this item (see enclosed "Sample Abatement-Certification Letter").