Violation Detail
Standard Cited: 19100219 C02 I Mechanical power-transmission apparatus.
Inspection Nr: 941314.015
Citation: 01019
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,500.00
Current Penalty: $3,500.00
Issuance Date: 03/07/2014
Nr Instances: 6
Nr Exposed: 20
Abatement Date: 05/02/2014
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 03/27/2014
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/27/2014 | $3,500.00 | 05/02/2014 | Serious | |
Penalty | Z: Issued | 03/07/2014 | $5,500.00 | 04/02/2014 | Serious |
Text For Citation: 01 Item/Group: 019 Hazard:
29 CFR 1910.219(c)(2)(i): All exposed part(s) of horizontal shafting seven (7) feet or less from floor or working platform were not protected by stationary casing(s) enclosing shafting completely or by trough(s) enclosing sides and top or sides and bottom of shafting. On or about 9/11/13, in the production areas located at 1 Lemon Lane, Atlanta, the employer did not ensure horizontal shafts were enclosed. Instances included: 1 - Old Cookie Oven conveyors at transfer to incline - vibrator shaft 2 - Colborne Line 1 - under conveyor 1 crossing over to conveyor 2 3 - PPL #3 - guard did not fully enclose shaft 4 - Packaging conveyors - shafts on underside and inside conveyor areas 5 - New cookie oven conveyor shafts 6 - Line IBL 1 line at back of conveyor In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.