Violation Detail
Standard Cited: 19100305 G02 III Wiring methods, components, and equipment for general use.
Inspection Nr: 922655.015
Citation: 01019
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,100.00
Current Penalty: $1,260.00
Issuance Date: 01/21/2014
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 02/14/2014
Gravity: 1
Report ID: 0213900
Contest Date:
Final Order: 02/07/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/07/2014 | $1,260.00 | 02/14/2014 | Serious | |
| Penalty | Z: Issued | 01/21/2014 | $2,100.00 | 02/14/2014 | Serious |
Text For Citation: 01 Item/Group: 019 Hazard:
29 CFR 1910.305(g)(2)(iii): Flexible cords were not connected to devices and fittings so that tension would not be transmitted to joints or terminal screws: a) Chlorine room: A wire powering the control panel on the M furnace evaporator had a torn strain relief, on or about 7/23/13.