Powered by GoogleTranslate

Violation Detail

Standard Cited: 19100303 G02 I General.

Inspection Nr: 1745840.015

Citation: 01019

Citation Type: Serious

Abatement Status:  

Initial Penalty: $14,518.00

Current Penalty: $14,518.00

Issuance Date: 10/10/2024

Nr Instances: 1

Nr Exposed: 2

Abatement Date: 11/06/2024

Gravity: 10

Report ID: 0625400

Contest Date: 11/06/2024

Final Order:

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty C: Contested 02/12/2025 $14,518.00 11/06/2024 Serious  
Penalty Z: Issued 10/10/2024 $14,518.00 11/06/2024 Serious  

Text For Citation: 01 Item/Group: 019 Hazard:

29 CFR 1910.303(g)(2)(i): Except as elsewhere required or permitted by Subpart S of Part 1910, live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by use of approved cabinets or other forms of approved enclosures or by any of the means identified in paragraphs (A), (B), (C), and (D) of 29 CFR 1910.303(g)(2)(i): Injection Department: On or about May 8, 2024, and at times prior thereto, live parts of electric equipment were not guarded against employee contact when injection heater band wires were hanging at waist level while employees are performing mold work.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close