Violation Detail
Standard Cited: 19100265 E01 IV Sawmills.
Inspection Nr: 1100641.015
Citation: 01019
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,000.00
Current Penalty: $1,000.00
Issuance Date: 03/10/2016
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 03/22/2016
Gravity: 5
Report ID: 0316400
Contest Date: 04/04/2016
Final Order: 07/18/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/18/2016 | $1,000.00 | 03/22/2016 | Serious | |
Penalty | C: Contested | 04/07/2016 | $2,000.00 | 03/22/2016 | Serious | |
Penalty | Z: Issued | 03/10/2016 | $2,000.00 | 03/22/2016 | Serious |
Text For Citation: 01 Item/Group: 019 Hazard:
29 CFR 1910.265(e)(1)(iv): Positive means were not provided to prevent unintended movement of log carriage(s): (a) Head Saw Operator Area: On or about October 21, 2015, and times prior, the control lever for the log carriage was not equipped with a device to prevent unintended movement.